Reference

Jacket foundations for 5m turbines at Alpha Ventus

Planning, engineering and Operational management of construction and assembly of jacket fundations for the 5M turbines.

What we did

  • Pile driving operation of 40-metre long piles
  • Positioning of jacket foundations
  • Sub sea grouting operation
  • Supply of marine coordination and operation crew

Equipment

Buzzard, JB-115, Menck 500 hammer, 72 slotted frame.

About Alpha Ventus Vindfarm

Twelve turbines of which six turbines are 5 megawatt (MW) Areva Multibrid (M5000) and six turbines are REpower 5M. Wather depth: 30 m.

DOTI GmbH
Borkum West
Germany
2008 - 2009